TERMINOLOGY, DIFFERENCES, AND CHALLENGES OF COMMUNICATIONS-BASED TRAIN CONTROL AND EUROPEAN TRAIN CONTROL SYSTEMS
![ERTMS/ETcS level 2 reference architecture for the trackside subsystem. | Download Scientific Diagram ERTMS/ETcS level 2 reference architecture for the trackside subsystem. | Download Scientific Diagram](https://www.researchgate.net/publication/270525060/figure/fig2/AS:335194969133062@1456928116918/ERTMS-ETcS-level-2-reference-architecture-for-the-trackside-subsystem.png)
ERTMS/ETcS level 2 reference architecture for the trackside subsystem. | Download Scientific Diagram
![Coordinates : A resource on positioning, navigation and beyond » Blog Archive » An analytical assessment of a GNSS-based train integrity solution Coordinates : A resource on positioning, navigation and beyond » Blog Archive » An analytical assessment of a GNSS-based train integrity solution](https://mycoordinates.org/wp-content/uploads/2016/03/b4.jpg)
Coordinates : A resource on positioning, navigation and beyond » Blog Archive » An analytical assessment of a GNSS-based train integrity solution
Modeling of ERTMS Level 2 as an SoS and Evaluation of its Dependability Parameters Using Statecharts
![Figure 1 from Research and Implementation of Functional Prototype of Radio Block Centre in the CTCS Level 3 System | Semantic Scholar Figure 1 from Research and Implementation of Functional Prototype of Radio Block Centre in the CTCS Level 3 System | Semantic Scholar](https://d3i71xaburhd42.cloudfront.net/963e664c8e4c4fa3cc60efee4a8360040962a3c3/2-Figure1-1.png)